disadvantages to woman

As soon as the water level in the river is always useful rain has become news. When less water basins or more when both lawmaker, he would have been a main location. When the river is eroding the possibility of increasing the flow in order to start increasing the risk to the Koshi Barrage and embankment Kosi water due to the risk of being sensitive to watch all have been uneven.

In 1 9 62 Saptakoshi Barrage built at that time was around 9 lakh cusecs of half the stated capacity of the water level. Located in Kolkata, India, Joseph and Company Limited Sun 1 9 1 9 62 52 to start the construction work in the Kosi barrage was completed. Kosi barrage and water control effort has become.

Kosi barrage was the building of the frozen river sand and a half at that time was 9 lakh cusecs capacity has been reported. Barrage Barrage was built only after 6 years of being the highest stage, was measured.
Previous
Next Post »